75 Hardness Molded PU Coupling Mountain Design Polyurethane Block

75 Hardness Molded PU Coupling Mountain Design Polyurethane Block

Solution description 

Substance

 Materials for silicon,fluorine,NBR,FPM,EPDM,SILCONE ACM,HNBR
Inspection Equipments  Excellent chemical and actual physical house, excellent oil- resistance, substantial temperature security, and so on.
Tolerance  +/-.05mm
Drawing Structure  PDF/DWG/DXF/IGS/Action,and so forth
Application subject  Parts are used on autos, printing equipment, food processing machines, textile machines, digital devices, and so on.
Production  process  CNC machining Broaching, Drilling, Milling, Other Machining Providers, Speedy Prototyping, Turning,
Form  As for every your drawing Or your sample
Color service   CZPTization
QC inspection

 Make certain a hundred% inspection ahead of the supply

Rewards Maintenance,acturally HRC coupling doesn’t need to have maintenance.
Environmental, elastic factors make HRC coupling applies to a selection of doing work circumstances.

CZPT transmission, in circumstance of elastic element is damaged, the puppy phase wichcasted siamesedly nevertheless preserve the transmission processing reliably.

Financial, HRC couplings have previously been created of optimization design,which make transmission power match the transmission shaft diameter.

Good recovery potential, elastic factors can decrease the load at the peak times, and the deviation is a major consideration when developing.

Adaptability of misalignment, HRC can coupling includes parallel change, angle change and axis change which happen some times.

Software and analysis

Our warehouse

CZPT rubber areas

CZPT plastic parts

Packing & Shipping and delivery

Packaging Information: plastic bag packing inside of, carton packing outside, or CZPT packing.
Port:Xihu (West Lake) Dis.g port, ZheCZPT city.
Lead Time :

CZPTtity(Pieces) one – one thousand 1001 – ten thousand 10001 – 50000 >50000    
Est. Time(times) 5 12 18 To be negotiated  

 

Area purchase methods

Our Providers:

one. Convenient: 24th Hours product sales/Right after-product sales Support on the internet or on the cellphone.

two. Quality Assurance: We will discuss with you and supply you the very best good quality cozy to your industry.

3. Quick shipping: Time is income, we guarantee we often will deliver the goods more quickly than others.

4. According to customers’ drawing,CZPT technical specs are welcomed.

five. Small orders can be acknowledged.

Packing

Firm Profile

SHEN ZHOU AOKAI RUBBER & CZPT CO.,LTD was founded in 2000. The manufacturing unit positioned in industrial zone of HangCZPT town, ZheCZPT province, china.

We have CZPT injection molding workshop and rubber compression molding workshops.Our main items includes Bakelit Knobs,Pull Handle,rubber doorway stops, doorway guard, roller, rubber bumpers, Rubber grommets, vibration dampers, seals, plastic corner, injection plastic brackets, injection plastic shell.to undertake different sorts of rubber molding and plastic injection components, customise in accordance to drawing and samples. 

The products have been exported to CZPTica, CZPTpe, CZPTia, Center CZPT, Southeast Asia and other locations and nations, and hope to build far more organization Cooperation with new consumer from all over the globe.

FAQ

Q1: Are you a maker or a trading company?

A1: We are the original producer of custom rubber parts and custom plastic elements.

Q2: The place is your firm positioned?

A2: Our firm is positioned in HangCZPT CZPT, ZheCZPT Province, China.

Q3: Could I get cost-free samples?

A3: We could give small samples for cost-free, but air freight or sea freight should be borne by consumer side.

This autumn: What must I supply in order to get an supply?

A4: CZPTers are needed to supply materials, interior diameter, outer diameter, cross segment length and quantity.

Q5: How is the products packed by your manufacturing facility?

A5: The products are generally packed by plastic luggage, carton packing containers with pallets or wood containers.

Q6: What are the incoterms utilized?

A6: The incoterms applied are FOB, CIF and CFR.

Q7: What are the payment phrases approved?

A7: We take Alibaba Trade Assurance, T/T, L/C and West Union.

Q8: What about the shipping time?

A8: The merchandise are normally dellivered to customer facet inside of seven-30 days based on the mode of transportation necessary.

 

75 Hardness Molded PU Coupling Mountain Design Polyurethane Block